Accelerate production while DM250 carousel option safely handles well pipe.
Choose dependable, efficient carousel option on DM250 to safely handle well pipe and speed overall production:
• create opportunity to task helper with other site chores.
• safe rod lock requires rod to be rotated and moved vertically before it can exit the pod.
• rotate carousel to place indicator arrow between grooves on base, push handle, and lock carousel into position for safe travel while in transport position.
• mechanical alignment of top head with well pipe using indicator arrow and grooves on base eliminates need for electrical sensor that could malfunction.
Contact Us
1835 Wall Street
Salina, Kansas 67401
Phone: (785) 825-1842
JP Anderson Well & Pump turned to the Geoprobe® DM250 to bring drilling back in-house, cutting well completion time in half while gaining cleaner boreholes, easier operation, and dependable support.
ID: 14815 | Date:
Rig service technicians work quickly to make precise repairs, knowing downtime affects the business.
ID: 14622 | Date:
DM650 pipe handling and backloading carousel make big-diameter wells faster, easier, and safer for crews.
ID: 14593 | Date:
From one rig to two in less than a year, DM250 holdback and carousel help keep Texas-based water well business running fast and efficient.
ID: 14591 | Date:
Canadian geothermal energy company chooses DM250 features like size-to-power ratio when expanding into vertical residential, small commercial geothermal installation.
ID: 14590 | Date:
DM Water Well Rig Series Overview
ID: 14052
ID: 14042
ID: 13829
DRILLMAX® DM250 Hydraulic Table
ID: 13358
ID: 13208
ID: 9589
DRILLMAX® DM250 - Rod Carousel
ID: 9583
ID: 5791