Skip to main content

One Team: Expanding Sonic Service Expertise, Together


2017 8150LS V2 with newly installed V3 sonic breakout.  Handles 2- to 14-inch tooling 31,000 lbf clamp force and 37,000 ft-lb twist torque (up from 21,000 lbf and 13,500 ft-lb)  Serviceable wear components eliminate future full breakout replacements   V3 sonic breakout upgrade available for 8150LS V1  and V2 models.

2017 8150LS V2 with newly installed V3 sonic breakout. Handles 2- to 14-inch tooling 31,000 lbf clamp force and 37,000 ft-lb twist torque (up from 21,000 lbf and 13,500 ft-lb) Serviceable wear components eliminate future full breakout replacements V3 sonic breakout upgrade available for 8150LS V1 and V2 models.

When Enviroprobe Integrated Solutions 8150LS V2 sonic rig rolled into the Kansas Service Center (KSSC) for a V3 sonic breakout upgrade, it wasn't a simple swap.

"They had an original breakout that was in pretty rough shape," said Troy Bourbon, KSSC sonic rig specialist. "Rather than putting considerable money into a rebuild, they decided to upgrade to the new one, which is faster and stronger."

The V3 sonic breakout:

delivers significantly more clamping and twist force

simplifies future service with replaceable components instead of swapping the entire breakout

But fitting a next-generation breakout to a field-proven machine demanded fabrication, problem-solving, and teamwork.

Learning by Doing

The upgrade gave newer technicians a chance to learn alongside Bourbon — dedicated sonic service expert — and lead sonic machine design engineer Mark Abker.

"This was a great chance for the team to learn about installing the new breakout and the sonic machines themselves," Bourbon said.

KSSC Technician Bryce Nichols came to service from his previous role as a Geoprobe® machine design engineer. Service Intern Jackson Sprecker is pursuing his mechanical engineering technology degree after spending a year and a half on the distribution team

Now they're applying an engineering mindset to service — cutting brackets, routing hoses, and positioning valve blocks together.

"Next time this comes around, I can say, 'Hey, I've done that before'," Sprecker said.

Nichols' instincts helped bridge the gap between design and execution.

"There was a lot of understanding how things should be put together," Nichols said. "Not just throwing stuff together, but knowing how to make it work like it should."

Engineering Backs Sonic Service

This was only the second V3 sonic breakout installation on a legacy sonic rig, and Bourbon leaned on engineering throughout.

"Engineering was a great resource," Bourbon said. "Abker helped us get things documented and parts modified. We took what we learned from the first install and improved the hose kit and mounting configuration."

Abker focused on the real-world details: hose routing, component placement, adapting a proven design to a different machine.

"On the V2 sonic rig, things are just a little bit different than on a V3 rig," Abker said. "We were figuring out how to route hoses and mount smaller components."

The seamless collaboration documented processes for future service support.

"Updates like this allow service team members to work closely with engineering, which makes our team and products better," Darren Stanley, service director, said.

More Than a Breakout

While the 8150LS V2 sonic rig was in the shop, the team also evaluated the sonic head, adjusted the head-feed chains, and confirmed turbine oil cleanliness — giving the customer confidence that the whole rig was ready to return to work.

The sonic breakout upgrade became a training ground for the next generation and proof that engineers and service technicians working together as one team build better solutions.

Contact Us

1835 Wall Street
Salina, Kansas 67401
Phone: (785) 825-1842

Photo Gallery


2017 8150LS V2 with newly installed V3 sonic breakout.  Handles 2- to 14-inch tooling 31,000 lbf clamp force and 37,000 ft-lb twist torque (up from 21,000 lbf and 13,500 ft-lb)  Serviceable wear components eliminate future full breakout replacements   V3 sonic breakout upgrade available for 8150LS V1  and V2 models.
Troy Bourbon, sonic service rig specialist, guides Jackson Sprecker, service intern and mechanical engineering technology student, during removal of the original breakout.
Bryce Nichols, service technician and former machine design engineer, refers to documentation while preparing to install the V3 sonic breakout on the legacy 8150LS sonic rig.
Bourbon assists Nichols positioning the V3 sonic breakout. The new breakout not only increases clamp and twist force but also simplifies service using replaceable components.

Related Articles


When a hydraulic issue threatened downtime, experienced service and responsive support kept a small business running.

ID: 14895 | Date:

Strong customer support and expert repairs turned a potentially serious equipment setback into a successful recovery.

ID: 14894 | Date:

Upgrading a well-maintained drill rig proved to be a cost-effective way to boost reliability and support long-term operations.

ID: 14893 | Date:

Elite Techniques Inc. relies on Geoprobe's North Carolina Service Center for dependable service, expert support, and quality repairs that help keep its drilling operations running smoothly.

ID: 14892 | Date:

Mobile Environmental Analytical Inc. relies on Geoprobe's East Coast Service Center for fast, expert repairs and responsive support that keep its drilling fleet operating efficiently and minimize downtime in the field.

ID: 14891 | Date: