Skip to main content

DRILLMAX® by Geoprobe® Drill Pipe Saves Production Time, Rig Wear


Using DRILLMAX® by Geoprobe® drill pipe propels production speeds while saving rig wear and tear.

Using DRILLMAX® by Geoprobe® drill pipe propels production speeds while saving rig wear and tear.

Christian & Pugh Well Drilling and Service in Virginia constructs wells by running a smaller diameter screen through casing. Since using DRILLMAX® by Geoprobe® engineered and manufactured drill pipe on their 2021 DM450, production times have decreased.

"The drill pipe helps us telescope the smaller screen much faster," Matt Cunningham, owner, said. "It's lighter, and the ID of the drill pipe is larger, and allows us to get more flow."

The significant difference in production rates prompted them to purchase a second set of drill pipe for their legacy model DM450.

Pulling drill pipe out of deep holes with the winches also becomes easier thanks to the drill pipe weight.

Prior to using the DRILLMAX® by Geoprobe® drill pipe, a company drilling 500-foot geothermal holes had to use the top head to pull the first three of the total 25 drill pipe because the winch wasn't strong enough. Now they can use the winch to pull the whole string, ultimately saving wear and tear on their rig.

 "The same through hole but less weight means carrying more pipe on the machine without negative impacts to drilling process," said Dillon Sickler, regional rig sales and service specialist.

Contact Us

1835 Wall Street
Salina, Kansas 67401
Phone: (785) 825-1842

Behind the Design - DRILLMAX® Drill Pipe

Related Articles


DM250 slips into small sites with ability to level up using outriggers behind cab.

ID: 14346 | Date:

DM650 Air provides time-saving features like backloading carousel and top head side shift.

ID: 14345 | Date:

DM250 small size and big power provides solutions to tight urban geothermal sites in the Los Angeles area.

ID: 14344 | Date:

DM450 equipped with twin centrifugal pumps offers impressive performance for diversified drilling sites.

ID: 14343 | Date:

Enhanced safety and reduced physical strain placed on your team proves invaluable when weighing cost of investing in a sonic rig system.

ID: 14159 | Date: