Skip to main content

Articles


What do owners think about their Geoprobe® drill rig? Check out some of the stories below to learn how their rigs helped them achieve success and perhaps discover how a Geoprobe® drill rig could spark the next step in your own environmental, geotechnical, exploration, geothermal, and water well drilling business growth.


article

Deeper, Faster, Better CPT Data and Operations

F&ME Consultants upgraded to a Geoprobe® CPT system for faster mobilization, deeper pushes, and more reliable data, giving them greater confidence on critical projects.

ID: 14811 | Date:
Dynamic Driller Spring 2026
article

Versatile 20-Ton Rated CPT Drill

The 20CPT Standalone Press can be mounted on any carrier, letting you tailor transport for your fieldwork.

ID: 14607 | Date:
Dynamic Driller Winter 2025
article

ASTRA True Interval Seismic CPT Testing

With a true interval seismic CPT module, two sensors are positioned exactly 0.5 meters apart, allowing a single hammer strike to be recorded at both depths at the same time.

ID: 14604 | Date:
Dynamic Driller Winter 2025
article

CPT Machine Blows Efficiency Out of the Water

Pairing the 6712DT with the 20CPT Press makes a system that is faster, safer, and more efficient.

ID: 14362 | Date:
Dynamic Driller Spring 2025
article

Dedicated CPT Drilling Rig and Seismic CPT Creates Demand

Owning 20CPT Press on skid steer increases drillers' ability to take on more technical exploration projects and makes their in situ investigations easier.

ID: 14011 | Date:
Probing Times Spring 2024
article

Partnership Results in Speedy CPT Soil Test Rig for Solar Field

Geoprobe® Engineers listen to customer feedback to innovate and improve machines like the 20CPT Press.

ID: 14010 | Date:
Probing Times Spring 2024
article

Single Source for Cone Penetration Test Apparatus

With more than 25 years of experience, Geoprobe® has the technical team and equipment to support your CPT endeavors. “Cory and Troy have made efforts to be at our disposal to ask questions and their response time is exceptional,” said Derek Wolfe, engine

ID: 13401 | Date:
Probing Times Spring 2023
article

20CPT Skid Steer and CPT Equipment Economically Add Numerous Business Advantages

Adding 20CPT Skid Steer and CPT equipment provides economical way to gain footing in the CPT market.

ID: 12388 | Date:
Probing Times Spring 2022
article

Rigs for Efficient CPT Production

Power and ability to put in anchors quickly with the 6712DT with 20CPT Press results in more footage.

ID: 5776 | Date:
Probing Times Spring 2021
article

New Geoprobe® Seismic CPT

When compared to other seismic CPT systems, the Geoprobe® Seismic CPT provides better field performance with option to see arrival of the wave.

ID: 5752 | Date:
Probing Times Spring 2021
article

20 CPT Press now available with skid steer configuration

The Geoprobe® 20 CPT flexible mast option with quick mount design easily attaches the Geoprobe® 6712DT direct push machine.

ID: 1884 | Date:
Probing Times Spring 2018
article

Dedicated CPT Machine Opens Profit Options

Olsson desired an efficient, dedicated machine to run their CPT. In choosing the Geoprobe® 20CPT skid steer, their dedicated machine also provided profit versatility...

ID: 281 | Date:
Probing Times Summer 2020
article

Productivity Push Leads EGS to 20CPT

With drilling services focused predominantly on infrastructure investigations – roadways and bridges – Environmental and Geotechnical Specialists Inc...

ID: 5254 | Date:
Probing Times Spring 2019