Articles
What do owners think about their Geoprobe® drill rig? Check out some of the stories below to learn how their rigs helped them achieve success and perhaps discover how a Geoprobe® drill rig could spark the next step in your own environmental, geotechnical, exploration, geothermal, and water well drilling business growth.
Deeper, Faster, Better CPT Data and Operations
F&ME Consultants upgraded to a Geoprobe® CPT system for faster mobilization, deeper pushes, and more reliable data, giving them greater confidence on critical projects.
ID: 14811 | Date:
Dynamic Driller Spring 2026
Versatile 20-Ton Rated CPT Drill
The 20CPT Standalone Press can be mounted on any carrier, letting you tailor transport for your fieldwork.
ID: 14607 | Date:
Dynamic Driller Winter 2025
ASTRA True Interval Seismic CPT Testing
With a true interval seismic CPT module, two sensors are positioned exactly 0.5 meters apart, allowing a single hammer strike to be recorded at both depths at the same time.
ID: 14604 | Date:
Dynamic Driller Winter 2025
CPT Machine Blows Efficiency Out of the Water
Pairing the 6712DT with the 20CPT Press makes a system that is faster, safer, and more efficient.
ID: 14362 | Date:
Dynamic Driller Spring 2025
Dedicated CPT Drilling Rig and Seismic CPT Creates Demand
Owning 20CPT Press on skid steer increases drillers' ability to take on more technical exploration projects and makes their in situ investigations easier.
ID: 14011 | Date:
Probing Times Spring 2024
Partnership Results in Speedy CPT Soil Test Rig for Solar Field
Geoprobe® Engineers listen to customer feedback to innovate and improve machines like the 20CPT Press.
ID: 14010 | Date:
Probing Times Spring 2024
Single Source for Cone Penetration Test Apparatus
With more than 25 years of experience, Geoprobe® has the technical team and equipment to support your CPT endeavors. “Cory and Troy have made efforts to be at our disposal to ask questions and their response time is exceptional,” said Derek Wolfe, engine
ID: 13401 | Date:
Probing Times Spring 2023
20CPT Skid Steer and CPT Equipment Economically Add Numerous Business Advantages
Adding 20CPT Skid Steer and CPT equipment provides economical way to gain footing in the CPT market.
ID: 12388 | Date:
Probing Times Spring 2022
Rigs for Efficient CPT Production
Power and ability to put in anchors quickly with the 6712DT with 20CPT Press results in more footage.
ID: 5776 | Date:
Probing Times Spring 2021
New Geoprobe® Seismic CPT
When compared to other seismic CPT systems, the Geoprobe® Seismic CPT provides better field performance with option to see arrival of the wave.
ID: 5752 | Date:
Probing Times Spring 2021
20 CPT Press now available with skid steer configuration
The Geoprobe® 20 CPT flexible mast option with quick mount design easily attaches the Geoprobe® 6712DT direct push machine.
ID: 1884 | Date:
Probing Times Spring 2018
Dedicated CPT Machine Opens Profit Options
Olsson desired an efficient, dedicated machine to run their CPT. In choosing the Geoprobe® 20CPT skid steer, their dedicated machine also provided profit versatility...
ID: 281 | Date:
Probing Times Summer 2020
Productivity Push Leads EGS to 20CPT
With drilling services focused predominantly on infrastructure investigations – roadways and bridges – Environmental and Geotechnical Specialists Inc...